Project Reference
System Design and Electrical Engineering
Test and Commissioning
- 115 kV EGAT NAKORNRATCHASIMA 1 SUBSTATION
- 115kV IEC61850 EGAT SATUN SUBSTATION
- 230 kV GIS HINGKONG SUBSTATION
- 115/22 kV PEA AIS AWS AMATA SUBSTATION
- EGAT FLOATING SOLAR 31.2MWp UBOLRATANA DAM
- 115/22 kV PEA AIS AWS ESIE 1 SUBSTATION
- 115/22 kV PEA AIS AWS ESIE 4 SUBSTATION
- 230/115 kV EGAT RAYONG 2 SUBSTATION
- 115/22 kV PEA BAN PONG 3 SUBSTATION
- 22 kV 3x3.6 Mvar CAPACITOR BANK EGAT CHIANG MAI 2 SUBSTATION
- 230 kV EGAT PHOMPHIRAM SUBSTATION
- 115/22kV PEA THAWUNG SUBSTATION
- 115/33kV PEA PHUKET 3. SUBSTATION
- 115/33 kV CENTRAL FESTIVAL PHUKET SUBSTATION
- 115/22kV HANUMAN 1,8-5,9-10 SUBSTATION
- 115/22kV PEA RAYONG 4. SUBSTATION
- 115/22 kV PEA PHRA PHUTTHABAT 2. SUBSTATION
- 230/115 kV EGAT CHACHOENSAO 2. SUBSTATION
- 115/22 kV PEA KANCHANABURI 4. SUBSTATION
- 22kV EGAT HYDRO-FLOATING SOLAR SIRINDHORN DAM
- 115/22 kV MRT PINK LINE & YELLOW LINE SUBSTATION
- 230 kV EGAT KHLONG NGAE SUBSTATION
Preventive maintenance
- THAI CENTRAL AND CHERMICAL SUBSTATION
- 230/115 kV PHUKET 3 SUBSTATION
- KRUNGTHAI (MEA)
- TOBACCO AUTHORITY THAILAND (MEA)
- CHULALONGKORN HOSPITAL (MEA)
- SIRIRAT PIYAMAHAKARUN HOSPITAL (MEA)
- BANGKOK EXPRESSWAY AND METRO (MRT)
- THAI VEGETABLE OIL PUBLIC CO., LTD.
- TRIPECH ISUZU SALE CO.,LTD
- CHAROONH THAI WIRE & CABLE.CO.TH
- INGREDION COMPANY LIMITED
- FRIESLAND CAMPINA (FORTMOST)
Installation
- 22 kV INSTALLATION AND MODIFY BUSBAR FOR CT,PT ASAHI GLASS CO.,LTD.
- GIS 115 kV - KHUNSAI SUB STATION
- GIS 115 kV - PRAVET SUB STATION
- 115 kV - SARAHNROM WIND FARM SUBSTATION, NAKORNRATCHASIMA
- 115 kV - T3 WIND FARM SUBSTATION, CHAIYAPHUM
- 115 kV – GULF SUBSTATION, SARABURI
- 115 kV (PEA) – THA LI SUBSTATION
- 115 kV (PEA) – KHOEN KHEN SUBSTATION
- 115 kV (PEA) – SAKON NAKORN SUBSTATION
- 115 kV – GENERAL RUBBER THAILAND SUBSTATION
- 115 kV – GULF SUBSTATION, CHANA
- 115 kV – GULF SUBSTATION, SRIRACHA